You don't have javascript enabled. Good luck with that.
Pencarian
 254.16 meter Perrsegi Jalan Rusak di Palmerah Telah Ditambal
....
photo Wuri Setyaningsih - Beritajakarta.id

160 Damaged Road Points Repaired in Palmerah

In January-March period, as many as 160 damaged roads in Palmerah Sub-district, West Jakarta have been repaired using cold mix or cold asphalt.

In total, we use 468 sacks of cold mix to repair 254.16 square meters or 160 damaged road points

Palmerah Sub-district Bina March Unit Head, Made Widhi stated, several parts of roads were damaged because of excessive vehicle tonnage and inundation, especially when heavy rain falls.

13 Potholes on Jalan MT Haryono Have Been Repaired

"In total, we use 468 sacks of cold mix to repair 254.16 square meters or 160 damaged road points," he explained, Monday (3/29).

In details, his side repaired 73.96 square meters in January, 176.04 square meters in February, and 4.16 square meters in March.

This repair is expected to make road users to feel more safe and comfortable when using the road. He also asked that public facilities in properly maintained.

"After it is repaired, we hope people can take care of it," he asserted.

Linked News
Popular News indeks
  1. Sunny All Day Long in Jakarta

    access_time03-05-2024 remove_red_eye599 personAnita Karyati
  2. Distamhut Plants 150 Trees in Five City Areas Simultaneously

    access_time03-05-2024 remove_red_eye498 personAldi Geri Lumban Tobing
  3. Green Belt Arrangement on Jalan Panjang Duri Kepa Reaches 40 Percent

    access_time03-05-2024 remove_red_eye452 personTP Moan Simanjuntak
  4. W. Jakarta Bina Marga Sub-agency Repairs Kembangan Outer Ring Road Section

    access_time07-05-2024 remove_red_eye341 personTP Moan Simanjuntak
  5. Rice Stock in Jakarta Exceeds Safe Limit Ahead of Harvest

    access_time03-05-2024 remove_red_eye292 personAldi Geri Lumban Tobing